Skip to main content

Camp Columbia (Morris, Conn.)

 Organization

Found in 1 Collection or Record:

Summary of Precise Leveling

00-2010-162-0

 Collection
Identifier: 00-2010-162-0
Scope and Contents

Summary document that covers the work in precise leveling done at Camp Columbia, Morris, Conn., during the session of 1916, namely the line from the U.S.G.S. bench mark at Dover Plains, N.Y. to Camp Columbia and an extension of this line to the Morris Dam of the Waterbury Waterworks, a total distance of about 43 miles.

Dates: translation missing: en.enumerations.date_label.created: 1916

Filtered By

  • Subject: Land surveys X